Maps – the ‘nothing planned’ map 2016

These maps are not available to the public – the MRA says that they will only give maps to the Advisory Group, not the public – but they are consistent with maps shown to FoTB by Ian Mckee during a meeting, and are based on maps (below) obtained through the City of Stirling.

BFS-308-Entrance-CoS-Aerial-Photo-with-Caddy-road-LR

The line marked in red is the ‘proposed road alignment’ according to the MRA map.  The road cuts through Bush Forever Site 308 to the north.

BFS-310-Road-Mockup-ex-Caddy-LRThe line marked in red is the ‘proposed road alignment’ according to the MRA map.  The road cuts through Bush Forever Site 310 to the south.

Map from Cr Karen Caddy 160621 BFS 308 CA            Map from Cr Karen Caddy 160621 BFS 310 CA

These original maps from the MRA show:  ‘Proposed road alignment’ in red;  ‘Bush Forever Boundary’ in blue, and the yellow cross-hatching is labelled ‘Extent of Road Extension Works in Bush Forever Zone.’  The red road connects south / north so that through traffic can occur, providing a bypass to the Scarborough Beach Road intersection.